DOCUMENTS ON PM’S PACKAGE
Photo Gallery of PM's Package Related Works
Status Roads & Bridges under PM Package-11-08-2009
Key Features of Prime Minister’s speech made on 31.01.2008 at Itanagar
Prime Minister’s Package for Arunachal Pradesh
Instruction to Field Officers on implementation of PM’s Package
Annual Plan 2007-08, Arunachal Pradesh – allocation of grant under PM’s Package for completion of pending projects under Transport Sector, as a follows up of Prime Minister’s announcement made at Itanagar on 31-01-2008
1
Letter No. M.13048/2/(Aru)/2006/SP-ACA, Dated 25.02.2008
2
Work wise details (Roads)
Volume – A
3
Work wise details (Bridges)
Volume – B
4
Work wise details (Porter Tracks)
Volume – C
5
Work wise details (Suspension Bridges)
Volume – D
6
Work wise details (RIDF State Share)
Volume – E
7
Work wise details (NEC)
Volume – F
8
Work wise details (NLCPR)
Volume – G
Division – wise distribution of PM’s Package funds for the year 2007-08 & 2008-09 (uploaded on 01.03.2008)
Power Point presentation by Chief Engineer (EZ) on PM’s package on R&B sector in a meeting taken by Hon’ble Chief Minister on 05.03.2008
Instruction of Chief Engineer (D&P) on pre-feasibility studies
Note submitted to Secretary to Governor (Arunachal Pradesh) for appraisal to Hon’ble of Prime Minister of India
A follow-up action by Govt. of India on Trans-Arunachal Highway
Standard Terms of Reference for engagement of consultants for carrying out feasibility studies and inventorisation of New NHs for their improvement of National Highway standards (No. RW/NH/12011/1/99/w/RJ, dated 15th Jan 2001
Appointing a Nodal Officer for implementation of PM’s Package for completion of in-complete projects under Roads and Bridges
Letter to Chief Engineer, Border Road Organisation on Feasibility Studies of Trans-Arunachal Highway (uploaded on 26.03.2008)
Appointing a Nodal Officer for Planning & Monitoring of Trans-Arunachal Highway/SARDP-NE and other associated road programmes in PM’s package etc.
Constitution of a State Level Monitoring Committee to monitor SARDP-NE Programme of State of Arunachal Pradesh
Superintending Engineer Rupa’s instruction to field units on PM Package
.
List of roads under SARDP Phase ‘B’ for which DPR is to be prepared by State PWD (No. NH-12037/76/2004/NER/NH-10 (Vol. VII), dated April 11, 2008
.
Execution of 4-lanning from NH-52 to Itanagar (Letter dated 4th September/2008)
Procurement of Cement and Steel for works under PM Package including ACA/SPA (SH: Forwarding of Photocopy of Bank Guarantees)
Data required by NABSCON for Monitoring of PM’s Package
Download Sheet1
Download Sheet2
Download Sheet3
NABCONS appointed as 3
rd
party monitoring committee for PM Package – instruction regarding from Secretary (Planning)
TOP